看词语>英语词典>dam up翻译和用法

dam up

英 [dæm ʌp]

美 [dæm ʌp]

壅高;筑坝壅水;挡水

英英释义

verb

  • obstruct with, or as if with, a dam
    1. dam the gorges of the Yangtse River
    Synonym:dam

双语例句

  • The problem of uplift pressure being higher in non-overflow sections at the right bank of Shiquan dam has come up since the first dam safety inspection, a lot of studies and work have been done but got lower effect.
    石泉大坝右岸非溢流坝段扬压力超标问题自第一次安全定期检查提出后,曾做过大量的加固研究工作,但效果一直不明显。
  • Dam foundation and dam construction quality come up to excellent standards and the project is elected the high-quality project.
    大坝工程的基础处理及填筑施工质量达到优良水平,被水电部评为优质工程。
  • The dam body is mainly made up of dam shell, antiseepage, drainage, and protection slope.
    土石坝坝体主要由坝壳、防渗体、排水设备、护坡等组成。
  • In this paper, mainly based on arranging data with well pumping tests in dam foundation and sum up the laws of flows under the condition of deep well pumping, the useful dewatering calculation model and parameters were set up.
    本文主要通过坝基现场抽水试验试验资料整理,在揭示黄土坝基降水特性规律的基础上,确定可以反映现场抽水条件的的实用降水计算模型和参数;
  • Along with the development of the West Regions, West-East electricity transmission project, South-to-North Water Transfer project are under way, there are more and more constructions of high dam and giant reservoir coming up.
    随着西部大开发、西电东送以及南水北调等国家级大工程项目的开工建设,高坝大库的建设越来越多。
  • A commission report said the dam could lose up to60 percent of its operating capacity in30 years, though, because of sediment building up in the reservoir.
    但是湄公河委员会的一份报告说,由于水库泥沙堆积,沙耶武里水电站有可能在30年的时间里失去60%的发电能力。
  • The concrete seepage place of water conservancy engineering seepage is difficult to determine. We use the throwing salt method analyze the dam seepage and put up the evidence to engineering design of danger control.
    水利工程渗漏一般较难准确确定具体渗漏部位.用投盐法分析大坝渗漏,可为工程除险加固设计提供依据。
  • The impermeability of the concrete has been greatly improved and leakage of the dam body is decreased up to 1. 88 m3/ h, thus meeting the design requirement.
    堰顶横缝表面封堵和混凝土裂缝的化学灌浆处理,增强了混凝土的防渗性能,坝体渗漏量降为1.88m3/h,满足了设计要求。
  • A typical mud-gravel structure can be seen at the Shuiqiuchi Pool dam, it was piled up by debris flow deposits, and its formation is not related to mountain falling.
    水湫池堰塞坝的沉积物具有典型的“泥砾”结构,在形态特征上属于粘性重力流的碎屑流堆积;
  • The forecast model of dam deformation is set up on the basis of the time alignment decomposition method.
    基于时间序列分解法建立大坝变形预测模型。